REFERENCES

Sarralle - vacuum degassing

IIndustrial automation doo is designing the Vacum Deggasing package for the New project.

System commissioning phase planned for second part of year 2026.

Development of control SW and SCADA/HMI for:

  • Vacuum Degassing
Main contractor Sarralle SPA Spain 

 Arcelor Mittal Gijon - EAF 

IIndustrial automation doo have developed control package for EAF auxiliary system for Arcelor Mittal Belval Gijon in year 2026. 

System is in a commissioing phase.

Development of control SW and SCADA/HMI for:

  • Material handling plant
  • Oxygen Injection system
  • Fume Degassing system
  • Carbon Injection system
  • WTP
Main contractor Sarralle SPA Spain 

 AM Belval Luxembourg - Auxiliary and Material handling system

IIndustrial automation doo have developed control package for EAF auxiliary system for Arcelor Mittal Belval Luxembourg in year 2025. System commissioned in 2026.

Development of control SW and SCADA/HMI for:

  • Material handling plant
  • Scrap yard automation
  • WTP
  • Vaccum Degassing system
  • Carbon Injection system
  • Wire Feeder
Main contractor Sarralle SPA Spain 

Stegra / h2gs PCM

IIndustrial automation doo have developed Mill Exit, Inspection Line and Coil Logistic area in Siemens Tia portal for the SMS Group in 2025. 

PCM L1 Sw development:

  • Development of Mill Entry
  • Development of Inspection line
  • Development of Coil Logistic area
  • Modul test of developed SW
  • Integration test on 3D line simulator
  • Production test on 3D line simulaton

Main contractor SMS Group

Big River Steel Tandem Cold Mill

Industrial automation doo have developed complete  Skin pass mill Level 1 SW based on Siemens S7 and Scada HMI based on Siemens WinCC for the SMS Group in year 2022/2023

Skin pass mill L1 Sw development:

  • Development of Media system PLC
  • Development of Mill Sequences PLC
  • Development of Safety PLC
  • Development of HMI WinCC Scada

Main contractor SMS Group

aLUMINIUM dYNAMICS inc, usa

Industrial automation doo have developed Level 1 SW based on Siemens TIA Portal V17  for part of the HSM line in Aluminium Dynamics INC for SMS Group‚ year 2021/2022.

HSM Level 1 Sw development:

  • Light Shear Area
  • Coil Inspection Station area

Main contractor SMS Group 

Hot strip mill HBIS Serbia

Industrial automation doo have developed L1 Sw and Scada HMI for Modernization of 6 Stands AGC system based on SMS Probas system in 2018/2019 as well as:

  • Complete Electrical erection
  • Hot strip mill Hydraulics MCC modernization (Design, Fabrication, Installation, Commissioning)
  • Supply and installation of New terminal box parallelization system
  • Site and Installation supervision
  • Commissioning

Main contractor SMS Group

Skin pass mill Baosteel China

Industrial automation doo have developed complete  Skin pass mill Level 1 SW based on Siemens S7 and Scada HMI based on Siemens WinCC for the SMS Group in 2018 and commission the line in 2019

Skin pass mill L1 Sw development:

  • Development of Media system PLC
  • Development of Mill Sequences PLC
  • Development of Safety PLC
  • Development of HMI WinCC Scada

Main contractor SMS Group

Projects 2024/2025

Industrial automation reference list for year 2024/2025    

•      Arcelor Mittal Belval

               Material Handling For EAF
               Carbon Injection system
               Scrap Yard automation
               WTP Automation
               VD auxilires
               Wire Feeder machine automation

•      HBIS Serbia

Rolling mill cooling system modernization

Modernization of equipment on ammonia clarifiers

Installation of IMS Thickness Gauging System with x-rays on DCR Mill

Design, delivery and installation of overhead crane cabin with control equipment 

     

•      Big River Steel – Tandem Cold Mill

               Commissioning of the line

•      ADI Bourbon – SDE-HSM

                Commissioning of the line

Projects 2023/2024

Industrial automation reference list for year 2023/2024    

•      Big River Steel – Tandem Cold Mill

TCM SW development:
               Development of Mill Entry
               Development of Inspection line
               Development of Coil Logistic area
               Modul test of developed SW
               Integration test on 3D line simulator
               Production test on 3D line simulator

 

•      ADI Bourbon – SDE-HSM

               L1 Light shear area

               L1 Scrap handling

               L1 Coil inspection station

               Module test

               Integration test on 3D line simulator

Projects 2022/2023

Industrial automation reference list for year 2022/2023    

•      HBIS – Pickling Line – Line data Acquisition and Coil passport report system development – Level 2

Installation of new sensors and measurements for process monitoring and control

Integration of stand-alone processing units

Integration of production planning data 

Integration of all available measurements

Development of report system that collect production parameters for each coil – Coil Passport

 

•      HBIS – System for monitoring all hydraulic systems at Hot mill

          Installation of new sensors for monitoring oil level in all morgoil/hydraulic tanks on Hot rolling mill    

          Installation of new PLC systems with RIO stations for collection of all signals from field SW development for motioning and 

          maintenance of hydraulic system and integration in mill control 

 

•      Pometon SPA

           Project management services for installation of new  Coper powder plant in Serbia– client side

•      US Steel Koisce:

             Project management services for Tandem mill modernization project – client side

•      Modernization of control system for tundish car for CCM HBIS

           Modernization of the system for lifting/lowering on four (4) tundish car

Projects 2021/2022

Industrial automation reference list for year 2021/2022    

•        HBIS Serbia – Hot strip mill AGC modernization

               Commissioning & performance testing

             Training & production assistance

             Electrical “As Built package“

             Installation of Line Linde magnetic transducers on 6 stands 

 

•       ETL Line – Coil passport report system development – Level 2

               Integration of stand-alone processing units

               Integration of production planning data 

               Integration of all available measurements

               Development of report system that collect production parameters for each coil – Coil Passport

 

•       Design of oil colling system for plain bearings of HV motors for high
pressure pumps

               Complete mechanical and electrical design of cooling system for oil that lubricates

               plain bearings on HW motors for high pressure pumps

 

•       Velding Machine modernisation HBIS

               Mechanical and electrical modernisation of velding machine on Pickling line with Grapps and Taylor Winfield inc.

 

•       ORI MARTIN Brescia

               Electrical design package, Automation system design (PLC program, Safety PLC program, Scada development ,FAT)

 

•       Impol Seval, Sevojno

               Final commissioning HCM for SMS Group

•       Technosteel & consulting:

               Electrical design package for new EAF Plant 

               Electrical design package for New CCM Plant 